精品无码一区在线观看_尹人香蕉久久99天天拍_国产寡妇树林野战在线播放_日本精品一区二区三区在线视频_久久天堂av综合合色

聯(lián)系我們 | Contact Us
Changle people's Hospital

 
The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
 
Won the 2012 Weifang construction site comprehensive management model project award.